January 18, 2025 #1 Local News, Forum, Information and Event Source for Venice Beach, California.

Public Comment Is Open for the Sepulveda Pass Rail Line

Two meetings planned for January

By Dolores Quintana

Metro Los Angeles has opened public comment during the Environmental Review Phase of the proposed rail line that would connect the San Fernando Valley to the Westside through the Sepulveda Pass and eventually connect the areas served to LAX. 

The draft of the Environmental Impact Review for the project has been released and you can review the proposed rail lines, both heavy rail and monorail options, and lend your opinion to Metro on the subject and choose the one that you think would suit the situation best. 

Interested residents can use these options to comment on the proposals:

Online Comment Form: https://bit.ly/SepulvedaCommentForm

By mail: Peter Carter, Project Manager LA Metro

One Gateway Plaza, 99-22-6

Los Angeles, CA 90012

By email: sepulvedatransit@metro.net

By phone: 213.922.7375 

If you would like to learn more about the options, Metro Los Angeles has set up three virtual meetings online through Zoom:

Tuesday, January 11, 2022, 6 p.m. to 8 p.m. 

Registration: https://zoom.us/webinar/register/WN_QEfrVMtZRFKYZqPVgz26wg

Saturday, January 22, 2022, 10 a.m. to Noon 

Registration: https://zoom.us/webinar/register/WN_QwXtjBgbT8qR7-gO8nghzA

Of the six options available, three are heavy rail and three are monorails. 

Option One: Automated monorail that would be entirely aerial along the 405 corridor and the Metrolink Ventura County Line railroad tracks with an electric bus shuttle to UCLA. The monorail would originate from the Van Nuys Metrolink station and terminate at Expo Sepulveda Station. The trains could have between two and eight cars, with six cars the normal length during peak hours. Cars would hold 76 to 79 passengers each. The tram would run 15.3 miles and have eight aerial stations at Expo Sepulveda, Santa Monica, Wilshire, with a D line transfer, Getty Center, US 101, G Line Sepulveda Station, Sherman Way, and Van Nuys Metrolink Station. It would connect to UCLA through a separate electric shuttle bus at Wilshire Station. 

Option 2: Automated monorail with aerial alignment along the 405 corridor and Metrolink Ventura County Line railroad tracks with an aerial automated people mover connection to UCLA. 

This option is  identical to Option One except that the connection to UCLA is an automated people mover. A pedestrian bridge would run from the monorail station on the south side of Wilshire to an aerial Automated People Mover (APM) station on the north side of Wilshire. The APM would travel on a structure primarily along Gayley Avenue to an aerial station near the west end of Bruin Walk on the UCLA campus. The people mover would operate at the same frequency as the monorail.

Alternative 3: Automated monorail with aerial segment along the 405 corridor, an underground segment between Wilshire and Getty Center, then entirely aerial along the 405 and Van Nuys Metrolink Line railroad tracks.  

This alternative is similar to the first two options, the difference being that it has an underground segment to connect to UCLA and is slightly longer because of it at 16.3 miles. The additional station at UCLA would be an underground station.

Alternative 4: Heavy rail with underground segment south of Ventura Blvd and aerial alignment generally along Sepulveda Blvd in the San Fernando Valley. 

The first heavy rail option has almost all the same stations, there would be no stop at the Getty Center, and the same starting and ending points as the monorail options, but has fewer cars that can hold more people, normally each train would have three cars that could hold up to 170 people each. The train could attach an additional car if needed. Train frequency would be slightly slower at 2.5 minutes during peak hours. The train route would be a total of 14 miles and the line would go underground between the E Line and a portal south of Ventura Blvd in the San Fernando Valley. North of Ventura Blvd, the route would generally be located on an aerial structure above Sepulveda Blvd and the Metrolink Ventura County Line railroad tracks.

The train would have four underground stations at Exposition Blvd (Metro E Line), Santa Monica Blvd, Wilshire Blvd (Metro D Line) and UCLA’s Gateway Plaza, and four aerial stations at Ventura Blvd, the G Line’s Sepulveda Station, Sherman Way and the Van Nuys Metrolink Station. The connection to UCLA would be at an underground station at Gateway Plaza. 

Alternative 5: Heavy rail with underground segment along Sepulveda Boulevard and an aerial stretch along the Metrolink Ventura County Line tracks in the San Fernando Valley.  

This option is very similar to Option Four, the difference is that the alignment along Sepulveda Blvd is also underground, and the only aerial segment is along the Metrolink Ventura County Line railroad tracks. The connection to UCLA would also be at an underground station at Gateway Plaza. 

Option 6: Heavy rail that would be entirely underground including along Van Nuys Blvd in the San Fernando Valley and with a southern terminus station on Bundy Drive next to the E Line on the Westside. 

This option is the one that differs the most from the other heavy rail options. The line terminates at Expo Bundy instead of Expo Sepulveda. Peak hour frequency is every four minutes rather than two minutes. Train capacity is two, four or six cars and are expected to consist of six cars during peak periods, with each car having a capacity of 133 passengers. The route is 14.6 miles with the segment on the Westside running generally northeast between the E Line Expo/Bundy Station and the UCLA campus. The segment in the San Fernando Valley would follow Van Nuys Blvd. This option would have seven underground stations at Olympic Bl (Metro E Line), Santa Monica Blvd (West LA Civic Center), Wilshire Blvd (Metro D Line), UCLA’s Gateway Plaza, Ventura Blvd, the G Line’s Van Nuys Station and the Van Nuys Metrolink Station connecting to UCLA at Gateway, as usual.

The Sepulveda Pass Rail Project was partially secured through the passage of Measure M which is a transportation sales tax. In March, Metro Los Angeles approved contracts for two teams to develop these possible rail lines. LA Sky Rail Express, which is a team that includes John Laing, Skanska, BYD, Gensler, HDR, ACI and Innova, are working on the proposals for aerial monorail options and Sepulveda Transit Corridor Partners, which is a team that includes Bechtel Development Company, Meridiam Sepulveda and American Triple I, has been working on the proposals for heavy rail options.

Related Posts

Parts of Palisades Reopen as Containment Efforts Continue

January 17, 2025

January 17, 2025

The Los Angeles County Sheriff’s Department announced the repopulation of several zones, marking a significant step in the recovery Parts...

L.A. Officials Field Heated Questions from Distressed Palisades Residents at Town Hall

January 17, 2025

January 17, 2025

Officials detail fire containment efforts, home access timelines, and future wildfire prevention plans as residents express frustration over delays By...

SMPD Identify Suspect in Fatal Broadway Shooting, But Search Continues

January 17, 2025

January 17, 2025

Authorities Continue to Review Witness Statements and Surveillance Footage as Part of Their Ongoing Investigation Authorities have identified a suspect...

JINS Eyewear Opens Venice Store, Launches Wildfire Relief Donation Drive

January 16, 2025

January 16, 2025

The New Store, Located at 1227 Abbot Kinney Blvd., Introduces a Digital-First Shopping Experience Japanese eyewear brand JINS will open...

Pali Charter High Seeks Temporary Campus and Donations After Devastating Fires

January 16, 2025

January 16, 2025

The school is calling on local businesses, organizations, and individuals to help secure a temporary space Palisades Charter High School...

Bay Area Fish House Makes L.A. Debut in Santa Monica

January 16, 2025

January 16, 2025

Pacific Catch Brings Sustainable Seafood and Pacific Rim Flavors to Santa Monica in Its First LA-Area Location Pacific Catch West...

$12M Relief Fund Established for LA Artists Affected by Wildfires

January 15, 2025

January 15, 2025

The Initiative Is Spearheaded by the J. Paul Getty Trust, With Backing From the Mohn Art Collective, East West Bank,...

OPINION: Governor and City Should Pause on Rebuilding The Palisades

January 15, 2025

January 15, 2025

Venice Stakeholders Association President Mark Ryavec Argues for Fire-Resilient Reforms Before Rebuilding in the Pacific Palisades By Mark Ryavec Governor...

Former SWAT Officer Who Braved Pittsburgh Synagogue Shooting Loses Everything in Palisades Fire

January 15, 2025

January 15, 2025

Jeff Garris, a retired Pittsburgh SWAT officer celebrated for his heroism during the Tree of Life synagogue shooting, faces a...

(Video) At Vistamar School – Discover the way high school should be

January 15, 2025

January 15, 2025

Students achieve remarkable outcomes with our strong academics, small classes, andpersonalized approach. Our graduates don’t just attend college—they excel. Vistamar’sunique...

Venice Shorts: Democracy Denied?

January 14, 2025

January 14, 2025

Neighborhood Council Elections Mandate That Ballots Be Requested Will Cause Turnout and Participation to Plummet, No In-Person Voting Will Have...

SUV Set Ablaze Outside Marina del Rey Storage Facility

January 14, 2025

January 14, 2025

Ravenous Flames Consumed the Vehicle By Zach Armstrong An SUV was almost entirely engulfed in flames outside of a Marina...

LAFD Didn’t Deploy Available Firefighters or Water-Carrying Engines Despite Warnings: REPORT

January 14, 2025

January 14, 2025

Fire Chief Kristin Crowley Defended the Department’s Strategy, Citing the Need to Balance Wildfire Readiness With Increased Citywide 911 Calls...

Westside Businesses Transform Into Distribution Hubs and Shelters Amid Devastating Fire

January 14, 2025

January 14, 2025

Local businesses and volunteers transform spaces into shelters, donation hubs, and meal services, stepping up to support evacuees and frontline...

Marina del Rey Veterinarian Shelters Nearly 40 Pets Amid Devastating Fire: Report

January 14, 2025

January 14, 2025

Annie Harvilicz has turned her Marina del Rey animal hospital into a haven for displaced pets As the Palisades Fire...