February 23, 2025 #1 Local News, Forum, Information and Event Source for Venice Beach, California.

Public Comment Is Open for the Sepulveda Pass Rail Line

Two meetings planned for January

By Dolores Quintana

Metro Los Angeles has opened public comment during the Environmental Review Phase of the proposed rail line that would connect the San Fernando Valley to the Westside through the Sepulveda Pass and eventually connect the areas served to LAX. 

The draft of the Environmental Impact Review for the project has been released and you can review the proposed rail lines, both heavy rail and monorail options, and lend your opinion to Metro on the subject and choose the one that you think would suit the situation best. 

Interested residents can use these options to comment on the proposals:

Online Comment Form: https://bit.ly/SepulvedaCommentForm

By mail: Peter Carter, Project Manager LA Metro

One Gateway Plaza, 99-22-6

Los Angeles, CA 90012

By email: sepulvedatransit@metro.net

By phone: 213.922.7375 

If you would like to learn more about the options, Metro Los Angeles has set up three virtual meetings online through Zoom:

Tuesday, January 11, 2022, 6 p.m. to 8 p.m. 

Registration: https://zoom.us/webinar/register/WN_QEfrVMtZRFKYZqPVgz26wg

Saturday, January 22, 2022, 10 a.m. to Noon 

Registration: https://zoom.us/webinar/register/WN_QwXtjBgbT8qR7-gO8nghzA

Of the six options available, three are heavy rail and three are monorails. 

Option One: Automated monorail that would be entirely aerial along the 405 corridor and the Metrolink Ventura County Line railroad tracks with an electric bus shuttle to UCLA. The monorail would originate from the Van Nuys Metrolink station and terminate at Expo Sepulveda Station. The trains could have between two and eight cars, with six cars the normal length during peak hours. Cars would hold 76 to 79 passengers each. The tram would run 15.3 miles and have eight aerial stations at Expo Sepulveda, Santa Monica, Wilshire, with a D line transfer, Getty Center, US 101, G Line Sepulveda Station, Sherman Way, and Van Nuys Metrolink Station. It would connect to UCLA through a separate electric shuttle bus at Wilshire Station. 

Option 2: Automated monorail with aerial alignment along the 405 corridor and Metrolink Ventura County Line railroad tracks with an aerial automated people mover connection to UCLA. 

This option is  identical to Option One except that the connection to UCLA is an automated people mover. A pedestrian bridge would run from the monorail station on the south side of Wilshire to an aerial Automated People Mover (APM) station on the north side of Wilshire. The APM would travel on a structure primarily along Gayley Avenue to an aerial station near the west end of Bruin Walk on the UCLA campus. The people mover would operate at the same frequency as the monorail.

Alternative 3: Automated monorail with aerial segment along the 405 corridor, an underground segment between Wilshire and Getty Center, then entirely aerial along the 405 and Van Nuys Metrolink Line railroad tracks.  

This alternative is similar to the first two options, the difference being that it has an underground segment to connect to UCLA and is slightly longer because of it at 16.3 miles. The additional station at UCLA would be an underground station.

Alternative 4: Heavy rail with underground segment south of Ventura Blvd and aerial alignment generally along Sepulveda Blvd in the San Fernando Valley. 

The first heavy rail option has almost all the same stations, there would be no stop at the Getty Center, and the same starting and ending points as the monorail options, but has fewer cars that can hold more people, normally each train would have three cars that could hold up to 170 people each. The train could attach an additional car if needed. Train frequency would be slightly slower at 2.5 minutes during peak hours. The train route would be a total of 14 miles and the line would go underground between the E Line and a portal south of Ventura Blvd in the San Fernando Valley. North of Ventura Blvd, the route would generally be located on an aerial structure above Sepulveda Blvd and the Metrolink Ventura County Line railroad tracks.

The train would have four underground stations at Exposition Blvd (Metro E Line), Santa Monica Blvd, Wilshire Blvd (Metro D Line) and UCLA’s Gateway Plaza, and four aerial stations at Ventura Blvd, the G Line’s Sepulveda Station, Sherman Way and the Van Nuys Metrolink Station. The connection to UCLA would be at an underground station at Gateway Plaza. 

Alternative 5: Heavy rail with underground segment along Sepulveda Boulevard and an aerial stretch along the Metrolink Ventura County Line tracks in the San Fernando Valley.  

This option is very similar to Option Four, the difference is that the alignment along Sepulveda Blvd is also underground, and the only aerial segment is along the Metrolink Ventura County Line railroad tracks. The connection to UCLA would also be at an underground station at Gateway Plaza. 

Option 6: Heavy rail that would be entirely underground including along Van Nuys Blvd in the San Fernando Valley and with a southern terminus station on Bundy Drive next to the E Line on the Westside. 

This option is the one that differs the most from the other heavy rail options. The line terminates at Expo Bundy instead of Expo Sepulveda. Peak hour frequency is every four minutes rather than two minutes. Train capacity is two, four or six cars and are expected to consist of six cars during peak periods, with each car having a capacity of 133 passengers. The route is 14.6 miles with the segment on the Westside running generally northeast between the E Line Expo/Bundy Station and the UCLA campus. The segment in the San Fernando Valley would follow Van Nuys Blvd. This option would have seven underground stations at Olympic Bl (Metro E Line), Santa Monica Blvd (West LA Civic Center), Wilshire Blvd (Metro D Line), UCLA’s Gateway Plaza, Ventura Blvd, the G Line’s Van Nuys Station and the Van Nuys Metrolink Station connecting to UCLA at Gateway, as usual.

The Sepulveda Pass Rail Project was partially secured through the passage of Measure M which is a transportation sales tax. In March, Metro Los Angeles approved contracts for two teams to develop these possible rail lines. LA Sky Rail Express, which is a team that includes John Laing, Skanska, BYD, Gensler, HDR, ACI and Innova, are working on the proposals for aerial monorail options and Sepulveda Transit Corridor Partners, which is a team that includes Bechtel Development Company, Meridiam Sepulveda and American Triple I, has been working on the proposals for heavy rail options.

Related Posts

Breaking News: L.A. Mayor Karen Bass Removes Fire Chief, Appoints Interim Leader

February 21, 2025

February 21, 2025

Kristin Crowley Removed as Fire Chief; Veteran Firefighter Steps in as Interim Chief Mayor Karen Bass removed Los Angeles Fire...

(Video) Rifkin Raanan Dentistry Uses Expertise and Artistry to Give Patients Their Dream Smiles

February 21, 2025

February 21, 2025

For More Info, Go To https://rodneyraanan.com/ For More Info, Go To https://t.co/OTBZO5Nzje pic.twitter.com/iipOncogw8 — Yo! Venice! (@YoVenice) February 21, 2025

Three Arrested in Fatal Santa Monica Stabbing

February 21, 2025

February 21, 2025

The attack left one man dead and another injured Three men have been arrested in connection with a fatal stabbing...

Despite Venue Loss in Fire, Chamber Music Palisades to Hold Concert This Weekend

February 21, 2025

February 21, 2025

The program includes selections from Beethoven’s Violin Sonata No. 7 in C Minor and Brahms’ Violin Sonata No. 2 in A Major Chamber...

THIS WEEKEND: VNC to Host Candidate Meet and Greet

February 20, 2025

February 20, 2025

Attendees can hear from candidates about their platforms, ask questions, and learn about the election Residents of Venice will have...

Officials Issue Water Use Warning at Venice Beach Due to High Bacteria

February 20, 2025

February 20, 2025

Similar warnings have been issued for multiple locations across Los Angeles County The Los Angeles County Department of Public Health...

Pacific Coast Highway Reopens with Restrictions for Fire-Impacted Communities in Palisades, Malibu

February 20, 2025

February 20, 2025

Residents, essential businesses, and school buses regain access as PCH reopens with lane reductions, speed limits, and checkpoint requirements amid...

New Wine Bar and Market Set to Open in Marina del Rey

February 19, 2025

February 19, 2025

Those interested in attending its soft opening can sign up for an invitation on the restaurant’s website A new destination...

Ōwa to Host Coffee & Flower Pop-Up in Venice

February 19, 2025

February 19, 2025

The restaurant blends traditional flavors with locally sourced ingredients Japanese-inspired restaurant Ōwa is set to host a Coffee & Flower...

First Palisades Property Clears Wildfire Debris Ahead of Schedule, Mayor Announces

February 19, 2025

February 19, 2025

Officials have touted the cleanup effort as the fastest of its kind in California history The first property in the...

L.A. County Approves Eviction Protections for Fire-Affected Business Owners and Workers

February 18, 2025

February 18, 2025

New policy grants six-month relief to tenants and small business owners impacted by January fires, with $10 million in rental...

Venice Art Exhibit Raises $40K for Fire-Affected Artists, Gallery Continuing

February 18, 2025

February 18, 2025

Proceeds from artwork sales will go to the Grief and Hope Fund The independent Venice gallery ARCANE Space is rallying...

Community Tree and Native Planting Event Set for Venice

February 18, 2025

February 18, 2025

Participants are encouraged to bring gloves and gardening tools Volunteers will gather in Venice on Saturday, Feb. 22, for a...

Inglewood Man Arrested in January Homicide in Santa Monica

February 18, 2025

February 18, 2025

Month-Long Investigation Leads to Arrest A suspect has been arrested in connection with a fatal shooting that occurred last month...

Palisades Athletic Community Seek to Rebuild Programs, Fundraise for New Equipment

February 17, 2025

February 17, 2025

Local teams and organizations have launched fundraising efforts to help restore normalcy for affected players and ensure they can return...